Search This Blog

Tuesday, September 24, 2013

Missing Work from 9/20 and 9/23; Production Hierarchy

Thank you to the students who completed the assignments that I gave you while I was gone.  Those of you who were here, and did not complete the assignment, have received a Zero (0) for failing to complete the work.

For Period 3, that includes both the Peer Critique from Friday and the Production Hierarchy from Monday.

For Period 4, it's the Peer Critique that was due on Friday.

Today (9/24) 4th Period will watch the 4 Videos and complete their Production Hierarchy worksheet.  This is the first step in getting us ready for our team-based short film.

9/25 3rd Period will grade the Production Hierarchy worksheet.

Everyone should follow the Equipment Checkout schedule on the back board to ensure that your footage is shot before the due date next week (Oct. 2nd for Pd. 3, Oct. 3rd for Pd. 4).  Raw footage is due on your computer THAT DAY.

No comments:

Post a Comment